歡迎訪問山東途暢路橋工程有限公司網站!

冷再生機租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現在所在的位置 :首頁 - 新聞中心 > 公司新聞
公司新聞

冷再生機租賃樹根區域施工避讓技巧解析
來源:http://www.miaobizw.com/ 日期:2025-06-09

  在道路維修與再造工程中,樹根區域因其復雜的地下環境與生態敏感性,成為冷再生機施工需重點避讓的區域。通過精準識別、工藝調整與質量監控,可有效保護樹木根系,同時確保再生層施工質量。本文將系統闡述冷再生機在樹根區域施工的關鍵避讓技巧。

  In road maintenance and reconstruction projects, the tree root area has become a key area to avoid during the construction of cold recycling machines due to its complex underground environment and ecological sensitivity. By precise identification, process adjustment, and quality monitoring, tree roots can be effectively protected while ensuring the construction quality of the regeneration layer. This article will systematically explain the key avoidance techniques for the construction of cold regeneration machines in tree root areas.

  一、樹根區域精準識別技術

  1、 Accurate recognition technology for tree root area

  地質雷達探測

  Geological radar detection

  施工前采用地質雷達對作業區域進行掃描,通過電磁波反射特征識別樹根位置與埋深。該技術可探測直徑大于2cm的根系,定位誤差控制在±5cm以內,為路徑規劃提供數據支撐。

  Before construction, geological radar is used to scan the work area and identify the location and burial depth of tree roots through electromagnetic wave reflection characteristics. This technology can detect root systems with a diameter greater than 2cm, with a positioning error controlled within ± 5cm, providing data support for path planning.

  標記與隔離

  Marking and isolation

  根據探測結果,在樹冠投影邊緣外延1.5米范圍設置警戒區,采用柔性警示樁與熒光噴涂進行雙重標記。對于胸徑超過30cm的樹木,需擴大隔離范圍至2米。

  According to the detection results, a warning zone is set up within a range of 1.5 meters beyond the projection edge of the tree crown, using flexible warning posts and fluorescent spraying for dual marking. For trees with a diameter at breast height exceeding 30cm, the isolation range needs to be expanded to 2 meters.

  二、施工參數動態調整策略

  2、 Dynamic adjustment strategy for construction parameters

  銑刨深度控制

  Milling depth control

  在樹根區域邊緣,采用階梯式減深工藝,每米進深銑刨深度遞減2cm,至警戒區邊界時深度保留設計值的60%。這種漸變過渡可減少對淺層根系的擾動。

  At the edge of the tree root area, a stepped depth reduction process is adopted, with a milling depth decreasing by 2cm per meter of depth. When reaching the boundary of the warning zone, the depth is retained at 60% of the design value. This gradual transition can reduce disturbance to shallow root systems.

  行駛速度優化

  Driving speed optimization

  將常規施工速度從5m/min降至2-3m/min,通過冷再生機智能控制系統實現速度的平滑過渡。在警戒區內,采用“蛇形”走位,避免直線碾壓對根系的集中壓力。

  Reduce the conventional construction speed from 5m/min to 2-3m/min and achieve a smooth transition in speed through the intelligent control system of the cold recycling machine. Within the warning zone, adopt a "snake like" positioning to avoid concentrated pressure on the root system caused by straight-line crushing.

  刀具組合創新

  Innovation in Tool Combination

  更換為窄幅刀具組,刀間距縮小至常規值的70%,減少單次銑刨寬度。在樹根密集區域,采用“跳刀”工藝,間隔50cm進行局部再生,降低對根系的切割風險。

  Replace with a narrow cutting tool set, reduce the tool spacing to 70% of the conventional value, and decrease the width of a single milling operation. In areas with dense tree roots, the "jumping knife" technique is used to perform local regeneration at intervals of 50cm, reducing the risk of cutting the roots.

beb4b1e7-8c34-4d8e-9505-946e774c58f9

  三、特殊工藝應用

  3、 Special Process Applications

  人工輔助剝離

  Manual assisted peeling

  對于探測到的直徑大于5cm的樹根,采用人工風鎬進行保護性剝離,保留30cm厚度的原生土作為根系緩沖層。剝離后的根孔采用冷補料回填,防止塌陷。

  For tree roots with a diameter greater than 5cm detected, artificial air picks are used for protective stripping, and 30cm thick native soil is retained as a root buffer layer. The stripped root hole is backfilled with cold patching material to prevent collapse.

  振動隔離技術

  Vibration isolation technology

  在冷再生機與地面接觸部位加裝橡膠減震塊,將振動加速度降低。對于古樹名木,需在樹基周圍鋪設2米寬的泡沫玻璃板,形成振動隔離帶。

  Install rubber shock absorbers at the contact area between the cold regeneration machine and the ground to reduce vibration acceleration. For ancient and famous trees, it is necessary to lay a 2m wide foam glass plate around the tree base to form a vibration isolation belt.

  濕度調控

  Humidity control

  通過噴灑系統實施微量補水,保持再生料含水率在最佳值±1%范圍內。在樹根區域,額外增加0.5%-1%的含水率,利用水的潤滑作用減少銑刨阻力。

  Implement micro water replenishment through a spraying system to maintain the moisture content of the regenerated material within the optimal range of ± 1%. In the root area, an additional 0.5% -1% moisture content is added to reduce milling resistance by utilizing the lubrication effect of water.

  四、質量監控與修復措施

  4、 Quality monitoring and repair measures

  實時監測系統

  Real time monitoring system

  在冷再生機作業臂安裝位移傳感器,實時監測銑刨深度,誤差超過預設值時自動報警。采用紅外熱像儀檢測再生層溫度,確保均勻性。

  Install displacement sensors on the working arm of the cold recycling machine to monitor the milling depth in real-time, and automatically sound an alarm when the error exceeds the preset value. Using an infrared thermal imager to detect the temperature of the regeneration layer and ensure uniformity.

  生態檢測

  Ecological testing

  施工后7天內,每日檢測樹木葉片電導率,數值超過閾值時啟動應急補水。對于出現萎蔫的樹木,采用樹干注射營養液的方式進行搶救。

  Within 7 days after construction, the electrical conductivity of tree leaves should be tested daily, and emergency water replenishment should be initiated when the value exceeds the threshold. For trees that have wilted, the method of injecting nutrient solution into the trunk is used for rescue.

  缺陷修復

  Defect repair

  對于因施工造成的根系暴露,立即用濕潤草炭土覆蓋,厚度不小于10cm。再生層出現的局部離析,采用冷補瀝青混合料進行點補,確保平整度。

  For root exposure caused by construction, immediately cover it with moist peat soil with a thickness of not less than 10cm. For local segregation in the regeneration layer, use cold patching asphalt mixture for spot patching to ensure flatness.

  五、環境協調與長效保護

  5、 Environmental coordination and long-term protection

  根系保護層施工

  Construction of root protection layer

  在再生層與樹穴之間澆筑20cm厚的陶粒混凝土過渡層,既保證排水通暢,又形成物理屏障。表面鋪設土工布,防止再生料中的細粒料侵入根系區。

  Pour a 20cm thick transition layer of ceramic aggregate concrete between the regeneration layer and the tree hole to ensure smooth drainage and form a physical barrier. Lay geotextile on the surface to prevent fine particles from entering the root zone of recycled materials.

  智能養護系統

  Intelligent maintenance system

  在樹基周圍埋設土壤溫濕度傳感器,通過物聯網平臺實時監控。當含水率低于15%時,自動啟動滴灌系統進行補水,維持根系活性。

  Bury soil temperature and humidity sensors around the tree base and monitor them in real-time through an IoT platform. When the moisture content is below 15%, the drip irrigation system will automatically start to replenish water and maintain root activity.

  冷再生機在樹根區域施工需建立“探測-避讓-保護-修復”的全周期管理體系,通過參數優化、工藝創新與智能監控,實現工程建設與生態保護的平衡。隨著非破壞性檢測技術與生態修復材料的發展,樹根區域施工將向更精準、更環保的方向演進,為城市更新提供可持續的解決方案。

  The construction of cold recycling machines in tree root areas requires the establishment of a full cycle management system of "detection avoidance protection restoration", which achieves a balance between engineering construction and ecological protection through parameter optimization, process innovation, and intelligent monitoring. With the development of non-destructive testing technology and ecological restoration materials, the construction of tree root areas will evolve towards more precise and environmentally friendly directions, providing sustainable solutions for urban renewal.

  本文由冷再生機租賃友情奉獻.更多有關的知識請點擊:http://www.miaobizw.com真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.miaobizw.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

  • 上一條:冷再生機:道路養護領域的革新利器
  • 下一條:冷再生機租賃可以用在那些場景中?
  • 相關產品:

    相關新聞: